Contact US | Gaia Solutions | Client List | Bio Pak | Home

PENINSULA PAPAGAYO - GUANACASTE, COSTA RICA
FOUR SEASONS HOTEL

CLIENT: Ecodesarrollo Papagayo

This is a 2250 Acre Master Planned Project located on the Northwest Coast of Costa Rica. and includes the Peninsula’s first Hotel Resort the Four Seasons. The Project at Build – Out will include 2 large scale Resort Complexes, 6 to 8 Boutique Hotel Sites, 2-3 World Class Golf Courses, Beach Clubs, Interpretive Centers, a Marina and 900 Upscale Homes Sites.

GAIA Group is providing Planning, Design and Review Services on Water Related aspects of the Project along with and international team of civil engineers, designers and planners:

These Services have included the following:

  • Definition of Project Wide Water Demands for Potable and Irrigation Uses
  • Development of a Water Strategy for the Site that includes use of Treated Water, Salt Water and Fresh Irrigation Water to satisfy the Water Demands of the Project and conserve Aquifer Sourced Supplies
  • Completion of a Feasibility Review for Off Site Water Sources – included Long Distance Aqueduct, Reservoir Development, Aquifer Wells Sources and Desalinization
  • Master Planning for Peninsula wide Collection Systems
  • Master Planning for Peninsula wide Wastewater sheds and Wastewater Treatment Facilities
  • Technology Review of Wastewater Treatment Options and Development of Recommended Approach
  • Reviews of on Site Potable and Irrigation Distribution Systems
  • Definition of Wastewater Environmental Standards for the Project
  • Review of Green Strategies and Uses
  • Project Direction/Management of the Designs and Approvals for the Four Seasons Wastewater Treatment Plant (a 145,000 GPD facility) Including Construction Documents
  • Project Direction/Management of Off Site Water Delivery Systems Design (including Wells, Repump Station and 15 km of Piping) Including Construction Documents
  • Project Lead on Erosion Control Action Plans for the Site during Construction
  • Definition of Telemetry Controls and Monitoring Scheme for Wastewater Plants, Pump Stations, Salt Water Delivery, Mixing Lake Management and Off Site Water Delivery System


Lake and paved road visible in lower right corner of photo. Graded road bed and golf holes extend toward tip of peninsula(October 2002).



Other Associated Services have included:
  • Definition of Conceptual Strategies for an Integrated Solid Waste Management System for the Peninsula and Waste Volume Estimates
  • Preliminary Master Planning the Farm Site Staging Area – including Off Site Water Storage, Nurseries, Material Supply Forwarding, Worker Facilities etc.
  • Preliminary Program Definition of Site Communications and Security Buildings including Technology Requirements.



Golf course driving range (February 2003)



Lake at golf hole 13 (January 2003)



Four Seasons waste water treatment plant (December 2002)



Infrastructure near Main Entry (September 2001)

Contact US | Gaia Solutions | Client List | Bio Pak | Home